Skip to main content
QC

Quik Charge

Quik Charge operates ultra‑fast Level 3 electric vehicle charging stations that remain reliable even during grid spikes by using Electric Era’s Super Nodes technology. Their chargers deliver high‑power charging at any hour, reducing outages and surge pricing that typically affect conventional stations. The company’s first public site opened at 850 Washington St in Weymouth, MA, where drivers can charge quickly and enjoy on‑site snacks.

Updated 1 month ago

Funding

Funding not disclosed

Funding rounds are not available yet.

Founders

Founder details are not available yet.

Product

Problem

Current electric grids are not designed to handle the high power demand of modern Level 3 EV charging stations, leading to frequent outages, reduced charging speeds, and costly surge pricing during peak usage.

Solution

Quik Charge delivers ultra‑fast Level 3 charging by sourcing power from Electric Era’s dedicated Super Nodes, which operate independently of the traditional grid. This architecture ensures consistent charging speeds and eliminates downtime or surge fees, even during periods of high demand. The company’s first station in Weymouth, MA provides drivers with rapid charging alongside on‑site snack options from Shawarma and Shakes, creating a convenient stop for both vehicle and personal refreshment.

Target Audience

Primary customers are electric vehicle owners seeking reliable, high‑speed charging on the go, particularly those traveling through the Boston metropolitan area.

Features

  • Level 3 chargers powered by high‑capacity Super Nodes, bypassing grid constraints
  • Guaranteed charging speed and availability 24/7, unaffected by grid outages or surge pricing
  • Ultra‑fast charging times comparable to the fastest stations on the market
  • On‑site food service (Shawarma and Shakes) for driver convenience during charging
  • Single-location deployment with plans for expansion to additional high‑traffic sites
This profile is AI-generated and may contain inaccuracies.