
Neara
Neara sells a physics-enabled digital twin of electricity networks: a 3D model of poles, lines and terrain that simulates how the grid behaves in real conditions. Utilities use it to predict failures, plan flood and wildfire response, and test design changes before crews go into the field. The model is built from data the utility already holds, such as LiDAR, aerial imagery and GIS records.
- Data & Analytics
- Software Only
- Utilities
Funding
Raised to date
$70MRaised to date based on public sources. This may differ from the amount the company actually raised and is based only on what is publicly available on the internet.
across 2 rounds




E+2$64M · Series D
Announced Feb 2026
Disclosed cumulative: $70M
Founders
Product
Problem
Utilities often see only fragments of their network, because asset records, terrain data and inspection results sit in disconnected systems. That makes it hard to say which poles or spans will fail first, or how a flood, storm or new load will affect the grid.
Solution
Neara builds a 3D physics-enabled digital twin of a utility's whole network from data it already has, including LiDAR, aerial imagery, GIS records and inspection data. The model places every pole, line and structure in its real terrain and adds loads, clearances and weather exposure. Engineers then run simulations on that geometry: wind, ice, flood, vegetation growth, re-conductoring or new builds. They can also test field actions, such as moving a pole or reconfiguring a line, and see the effect on clearance, loading and risk before committing. The same model produces prioritized hardening plans, regulator-ready reports and field work orders.
Target Audience
Electric distribution and transmission utilities, plus engineering firms that do network planning and asset work for them.
Features
- See how each pole and span behaves in real terrain, weather and flood conditions.
- Trace how a failure would spread across the network and which assets are exposed.
- Rank vegetation encroachments and clearance violations by how much risk they carry.
- Test route options and span lengths for new lines before construction starts.
- Check whether existing lines can carry more power without new infrastructure.
- Produce regulator-ready reports and field work orders from the same model.