Skip to main content

Constantine Energy Storage

Constantine Energy Storage develops and operates grid-scale battery energy storage systems. These systems provide flexible capacity and ancillary services to the grid, enhancing reliability and integrating renewable energy sources.

Traction 9/10
HQ unknown
Founded 2021141K+ followers
  • Battery Technology
  • Clean Technology
  • Energy
Updated 6 months ago

Funding

Raised to date

$233.7MRaised to date based on public sources. This may differ from the amount the company actually raised and is based only on what is publicly available on the internet.

Funding rounds are not available yet.

Founders

1 founder

Louis Burford

Energy Storage | Energy start-ups | Full of Energy

Product

Problem

The increasing reliance on renewable energy sources necessitates advanced energy storage solutions to address intermittency and ensure grid stability. Fluctuations in renewable energy generation can lead to imbalances in electricity supply and demand, potentially compromising grid reliability and efficiency.

Solution

Constantine Energy Storage develops, owns, and operates grid-scale battery energy storage systems (BESS) to provide flexible capacity and ancillary services, thereby enhancing grid resilience and facilitating the integration of renewable energy. Their portfolio of BESS assets is strategically located to optimize grid balancing and ensure a secure and reliable energy supply. By storing excess renewable energy and dispatching it when needed, Constantine Energy Storage enables a smoother transition to a zero-carbon power system. The company's projects involve both transmission and tertiary connections, with a focus on deploying systems with long duration storage capabilities.

Target Audience

Constantine Energy Storage serves grid operators, utilities, and other stakeholders involved in maintaining grid stability and integrating renewable energy sources.

Features

  • Portfolio of grid-scale battery energy storage systems (BESS)
  • Projects range from 57MW to 285MW in size, with storage durations around 2.7 hours
  • Both transmission-connected (132kV) and tertiary-connected projects
  • Focus on strategic locations to optimize grid balancing
  • Construction and operation of BESS assets
This profile is AI-generated and may contain inaccuracies.