Skip to main content

Armour Edge

Armour Edge makes leading edge protection (LEP) for wind turbine blades: semi-flexible thermoplastic shields bonded to the blade edge that faces the wind. Wind farm owners and operators fit them to limit rain and particle erosion, which wears away the blade edge and cuts aerodynamic performance. The shields are custom-fitted to each blade shape and the company says its customers span four continents.

Traction –/10
Edinburgh, United Kingdom · HQ
101K+ followers
  • New Materials
  • Hardware
Updated today

Funding

Raised to date

£700KRaised to date based on public sources. This may differ from the amount the company actually raised and is based only on what is publicly available on the internet.

Est. $889K

across 1 round

GI

£700K · Seed

Announced Sep 2021

Disclosed cumulative: $889K

Founders

1 founder

Andrew Pringle

Chairperson of Edge Solutions Ltd

Product

Problem

Wind turbine blades erode at the leading edge, the strip that meets the wind first, as rain and airborne particles hit it at high tip speed. The wear dulls the blade's aerodynamics and forces operators into repairs and lost production.

Solution

Armour Edge sells leading edge protection (LEP) shields made from a semi-flexible thermoplastic. Each shield is precision-engineered and custom-fitted to the geometry of a specific blade, then bonded to the blade's leading edge. Because the shield follows the blade's shape, it keeps the aerodynamic profile rather than adding a blunt layer. Installation is designed to be easy and repeatable, so crews get consistent results and the turbine spends less time out of service. The company says its system has been installed in the field since 2020 and that repeat orders are growing.

Target Audience

Wind farm owners and operators, onshore and offshore, who maintain turbine blades and want to cut erosion repairs and lost output.

Features

  • Fit a shield shaped to a specific blade model rather than a generic strip
  • Bond the shield to the leading edge to hold off rain and particle erosion
  • Keep the blade's aerodynamic profile with a semi-flexible thermoplastic shield
  • Install with a repeatable process that limits turbine downtime
  • Buy from an international supply chain with fulfilment across four continents
  • Use a business case calculator to work out the return on an LEP installation
This profile is AI-generated and may contain inaccuracies.